The design phase of Auburn’s new standalone Football Performance Center has been completed, the university revealed Friday in an array of newly published documents.
The Football Performance Center, which will be built at the site of the old track on Biggio Drive, is becoming more of a reality for Auburn after a years-long process of bringing the facility to fruition, with mass grading at the site is already underway. Thedesign for the project was completed by the firm Goodwyn, Mills and Cawood, which has offices throughout the southeast, and with HOK Architects of Kansas City, Mo (https://www.al.com/auburnfootball/2020/03/ad-allen-greene-auburn-full-steam-ahead-on-football-facility.html). The firm has previously worked with Auburn on the university’s wellness kitchen, as well as the Watson Fieldhouse on campus. The firm also worked with Clemson on its $55 million football facility that opened in 2017, as well as with UAB on its football operations center.
Auburn’s Football Performance Center will include, among other features, an indoor practice facility, two outdoor fields, locker room, weight room, players lounge, barbershop, team meeting rooms, offices and a lounge for recruits.
With the design phase of the project completed, Auburn is moving on to accepting bids for the construction and cost of the project. Sealed bid proposals are being accepted by the university until 3 p.m. CT on Feb. 9, at which point all bids will be unsealed and made public, and a contracted awarded to the lowest responsible bidder.
Here’s a look at some of the design renderings of the Football Performance Center:
(https://www.al.com/resizer/pNxQZ6slQuZEaG29-zte9r_yVCs=/1280x0/smart/cloudfront-us-east-1.images.arcpublishing.com/advancelocal/Y4FGWLOE2BFHVJ732U7TB3ZTUQ.png)(https://www.al.com/resizer/_0cvqGWbjGYcb9a_sz2PHmg8Jgk=/1280x0/smart/cloudfront-us-east-1.images.arcpublishing.com/advancelocal/SS7XODA225GCLAQ2S2X7CGZIAM.png)(https://www.al.com/resizer/MZzqL4IZdfrqS8juu0MZKGUglWk=/1280x0/smart/cloudfront-us-east-1.images.arcpublishing.com/advancelocal/CE3SU6VJS5BANMBA62GWOQQRAI.png)(https://www.al.com/resizer/2YkVR4LHqo3Z5AqR3C9avn4VKJ0=/1280x0/smart/cloudfront-us-east-1.images.arcpublishing.com/advancelocal/XHUFWHQDBFB4XLDEVZPQH2MFEQ.png)(https://www.al.com/resizer/RkBtz2OlwrTrUjT3gL3zvudKHeM=/1280x0/smart/cloudfront-us-east-1.images.arcpublishing.com/advancelocal/EG4PKIVQ4BAKTOTURDU2IX7YLM.png)(https://www.al.com/resizer/ofK0G9zsMmOjVM4VDZVJj5YPJts=/1280x0/smart/cloudfront-us-east-1.images.arcpublishing.com/advancelocal/ICAWCWYV5BA5HE2ZPUCLVYPVE4.png)https://www.al.com/auburnfootball/2021/01/auburn-reveals-completed-design-renderings-for-new-football-performance-center.html (https://www.al.com/auburnfootball/2021/01/auburn-reveals-completed-design-renderings-for-new-football-performance-center.html)